I am really appreciative of all the help that is provided here. Thank you very much. I am trying to build a bar graph with superimposed line.
The x axis is time in days to the procedure from admission.
The y axis is the number of the procedures.
The dataset is as:
patient_id timetoprocedure
1 2
2 5
3 2
4 1
5 6
6 8
7 11
8 3
9 4
10 4
11 3
12 5
13 1
14 2
15 3
I will really appreciate the answer.
Kind regards, WQ
Related Posts with Time to event graph
which method would be appropriate probit, logit, or anything else?Good morning, everyone, I am not very familiar with existing econometric methods, especially with s…
Please help me troubleshoot converting string date("20100201") into the format Stata recognizes as dateHi, I was converting string date data (variable Fdate and Pdate, they look like "20100201") into num…
Stata 16Dear Statalist, I hope this finds you well. I would like to ask regarding the new version of Stata …
Graph with standard deviation on the y axisDear Stata users, I am trying to replicate the paper "Revisiting the German wage structure" https://…
ImputationI am analysing a small number of patients (n=28) and want to do Spearman rank correlation. For one v…
Subscribe to:
Post Comments (Atom)
0 Response to Time to event graph
Post a Comment