Hi,
I am really appreciative of all the help that is provided here. Thank you very much. I am trying to build a bar graph with superimposed line.
The x axis is time in days to the procedure from admission.
The y axis is the number of the procedures.
The dataset is as:
patient_id timetoprocedure
1 2
2 5
3 2
4 1
5 6
6 8
7 11
8 3
9 4
10 4
11 3
12 5
13 1
14 2
15 3
I will really appreciate the answer.
Kind regards, WQ
Related Posts with Time to event graph
Not duplicating Mata code / Using STATA in MataI have a function which is straightforward to implement in both the ado scripting language and mata.…
Is there any way to create age and education variables of a father?Hi all, I am working with the Multiple Indicator Cluster Survey (MICS) whose research design is sim…
How does the option"ties" work in psmatch2?Hello: It says in the user's manual : ties not only match nearest neighbor but also other controls w…
Help to get rolling average (standard deviation) over 5 yearsHello, I have a panel data like this (unbalanced) ID Year V1 V2 0 2005 30 19 0 2006 20 67 0 2007 4…
Stata omitting two levels of a variable instead of oneI'm presently working on analyzing a survey with multiple waves. I've used append to attach the diff…
Subscribe to:
Post Comments (Atom)
0 Response to Time to event graph
Post a Comment