Hi,
I estimated a gravity model with the PPML estimator and fixed effects.
However, the R-squared is too high (closer to 1)
Does it mean that there is something wrong with the model?
Maybe this is because I have too many fixed effects?
Thanks!!
Related Posts with PPML R-squared to high
line graph at country and year level for several variables using levelsofHello all, I have a panel long format dataset that can be found attached containing year and countr…
conditions by groupHi there, I have the following data and I want a variable that is 1 if, by firmid, there is at least…
Stata Crashes while attempting collapseHello All, I run Stata SE 15.1 on a computer with 32 GB of RAM. I use Ubuntu as OS. And I have alre…
Saving tabstat results in new variablesHello, I'm using tabstat to generate weighted standard deviations, by year, for two variables in a …
T-test of difference between two regression coefficients within same modelHello, I have one single regression model estimating the coefficients (b) of two independent variab…
Subscribe to:
Post Comments (Atom)
0 Response to PPML R-squared to high
Post a Comment