Have been trying without luck to combine the two graph types (bar and connected line) to be overlayed. Both are to be displayed by group (organization) and time period (quarter). This requires the option over() used twice- I can successfully create the graphs separately but when I try: tw (bar...) || (connected ..., c(l)), it just fails at every turn. Thanks for any help.
0 Response to Help to combine graph bar and connected into single graph, by group(s)
Post a Comment