Hi, i am struggled with graph. I analyze the completion of M&A deals and I have a dummy variable completion with the value of 1 if the deal was completed and 0 otherwise and the year when it happened. I need to to have a graph with amount of deals on Y axis and year on X axis and 2 lines one showing all the amount of all deals announced, including both 1 and 0 and another line when completion has value of 1.
I tried to use the command
twoway line completion year
but it didnt work. Could you please help me with the code? Thank you in advance
Related Posts with Graph
Validity check for South African identity numbers using the Luhn algorithmTwo files (one ado; one do) attached, which checks a variable containing South African id numbers fo…
Eventstudy using either the estudy or eventstudy2 commandHi, I am currently trying to conduct an event study for my master thesis. However, I do have some t…
Two-way graph for panel dataDear, I want to plot a variable in panel data. Below is an example of my data. Code: year provinc…
Difference between two dates in daysHi all, I have a date of admission (ex. 02mar2018 00:00:00) and date of intervention (ex. 05mar2018…
Two-way graph for panel dataDear, I want to plot a variable in panel data. Below is an example of my data. Code: year provinc…
Subscribe to:
Post Comments (Atom)
0 Response to Graph
Post a Comment